Heroy Geology Laboratory
When built, most of the space in Heroy was used for laboratories, offices, storage rooms, and a 200-seat, oak-ceiling lecture hall. The interior was designed with geologic themes in colors and materials. The glass enclosed staircase from the lobby to the fourth floor served as a green house for trees. The design included removable ceilings allowing access to water, gas and electrical services. The first floor housed laboratories, each with an acid drainage system that emptied chemicals into a neutralizing pit in the basement, and fume systems for removing noxious gases used in experiments. The ground floor housed a wet tank for water wave experiments.
By 2010, new research equipment requiring significant upgrades in electrical power, water, and drainage and cooling systems had taxed the building’s utilities. To make better use of teaching, laboratory and storage space, a multi-year renovation project began.