You are viewing an old version of this page. View the current version.
Compare with Current View Page History
« Previous Version 21 Next »
A special feature at the time the building was built was a ventilation system to purify the air as it was drawn out of the chemistry labs. When Life Sciences Complex was completed in 2008, an atrium was added to connect the two buildings.