borderStyle | none |
---|
A special feature at the time the building was built was a ventilation system to purify the air as it was drawn out of the chemistry labs. When Life Sciences Complex was completed in 2008, an atrium was added to connect the two buildings.
Panel |
---|
|
| |
CST 1-019 |
|
| |
CST 4-201 |